Constructim
HELLA ROMANIA SRL
Description Production hall, built on the premises of the company where there is already an industrial administrative building, located at a distance of 6 m from the existing building. The connection between the two bodies is made through a tunnel with a height of 4.5 m at the attic. The building of the new hall
SIMULTAN SRL
Description Storage hall in partial G+1F regimeHall on reinforced concrete structure – insulated concrete foundations – reinforced concrete pillars – metal roof with plated sheet covers plus PVC membrane – sandwich panels closing walls – concrete floor paved in concrete and tiles in rooms.The hall includes the office area in the part of G+1F, made
ROMPRIX EXIM SRL
Description Industrial hall in ground floor regime and administrative area (offices) in height regime G + 2F– structure from prefabricated concrete– BA floor finished with quartz– Total surface: 2105.65 SQM– compartmentalization, functionality– Ground floor: Reception hall, Billing, Hallway, Printing, GS, Central heating, Storage room– 1st floor: Hall, GS, Office, Open space offices– 2nd floor: Hall,
ROLLING SRL
Description Building for storage, services, trade, administrative, prefabricated structure of reinforced concrete.Construction (extension) of building in ground floor regime with the function of commercial space, offices, warehouse, mechanical workshop and floor of administrative body in ground floor regime (body C1), resulting immobile in regime G + 1F, arrangement of premises (parking, car access, green areas
CEREAL DOCKS EAST EUROPE S.A.
Description Storage silos for agricultural products: – Reception, cleaning and transport facility– 3 grain storage silos– Scale house building, laboratory, offices– Auto platform / enclosure roads– Technical-public works.01. SILO ASSEMBLY – SCD = 1527.00 SQM This body is made of metallic structure – pillars all over the height and metallic structural panels. The metal body
Production and storage unit – BAUMIT
Description The project provides for the execution of industrial construction works and related installations at the production and storage unit in Șag, Timiș County, belonging to the Austrian company BAUMIT, one of the largest producers of construction materials in Europe. The extension of the unit, due to the need for increased production capacities, provides for
Roman Catholic Diocese
Description Construction of service house S+G+1F, garage and enclosure, Roman-Catholic Parish no. IV Josefin Timisoara – 792 sqm
Multicultural center – Timișoara
Description The building located in Timișoara, 5 Marasesti st. currently has a surface of 4300 sqm and is located on the property of the Timișoara City Hall. The building is dated as a construction from 1754-1757, rebuilt in the 19th century and is registered as a historical monument of national value, the building being in
Wastewater network – Biled
Description The investment includes works for sewerage network, pumping stations, canal connections, road crossings to cover extension of the sewerage network in the village, extension of networks on all streets to the N and S from the existing network, with connection in it as well as the connection of all properties to the domestic sewerage.
Church of the Holy Martyr Dimitrie
Description For the development of the Church ”Holy Martyr Dimitrie”(category A historical monument) restoration works are being carried out: – consolidation, restoration and preservation of the main body of the church, restoration and preservation of the interior fresco and of the artistic wooden components, restoration of the electrical, sanitary installations and creation of an adequate