Constructim
Terminal building – Oravița
Description The purpose of the investments project is to develop the public transport service from Oraviţa town, through a completely new and integrated service (of the elements to render traffic efficient and to diminish the exhaust fumes: e-ticketing system, traffic monitoring system, street infrastructure, purchase of ecological buses), which will lead to the decrease of
Timiș Community Centre – CJ Timiș
Description The investment provides for the construction of a new building, in GF+1F height, having the function of permanent centre. In order to create the appropriate conditions for the activities that will take place in the future, it was proposed to carry out the following works: Construction of the Community Centre for Lifelong Learning for
Military Casino – Timișoara
Description Pavilion A of the Timișoara Barracks, known as the Military Casino , is one of the oldest buildings in Timisoara, located on the west side of Liberty Square. The building is currently classified as a historical monument, with the code LMI TM-II-mA-06143. The construction of the buildings on the current site began in 1744,
Guala Dispensing – Caransebeș
Description The investment provides for the construction/extension of the existing hall, an extension that will have a ground floor height regime with a partial closure. The maximum height for the hall is 8.33 m. The building will have a storage function and will have a partial closure (2 walls are made of metal reflow and
Emanuil Ungureanu Technical College
Description The building in Piata Huniade no. 3 is an architectural monument and has special architectural features. It is classified in the List of Historical Monuments-2010 pos. 65 Code TM-II-a-B-06100. The building was erected by the Timisoara entrepreneur Eduard Reiter, based on the plans of the architect Albert Vigh, on the site of the former
Hall Constructim Imobiliare
Description The project envisages the construction of a production and storage hall for ironworks and aluminium profiles, with Gf+1 partial storey structure and an 1800 sqm area, which will be made on the following technical solutions: The resistance structure of the building is made of insulated reinforced concrete foundations, and frames (pillars and beams) made
Parța Museum Branch
Description The museum branch suggested for Parţa has multipurpose potential, as it can satisfy the interests of different categories of the visiting public. It is designed to be built in the vicinity of the Neolithic sanctuary that was discovered and which has been researched since 1980, by unveiling the monumental statue, which immediately stood out
Romanian Post Office
Description The headquarters of the county Post office of Timiș and Post Office 1 Timișoara, part of the CNPR patrimony, was built at the beginning of the 20th century, between 1911 and 1913, and initially bore the name of ”The Post Palace”, or “Poșta Mare”. From an architectural point of view, it was built in
Production and storage unit – BAUMIT
Description The investment objective “Repairs and change of use of the existing building from Detergents Factory to Construction Materials Warehouse, rebuilding of electrical installation; Exterior improvements consisting of; outdoor storage platform, car parking, fencing” is located in the northern part of Șag, on its outskirts, with access from the national road DN59/E70.The following will be
Student dormitories – UPT
Description The investment falls within the provisions of Government Program 2017-2020, according to the Parliament Decision no. 53/2017 for granting the confidence of the Government, l Annex no.2 – Policies in the field of education, Measure 11 -“Increasing participation in university education, while improving its quality and relevance”, including the consolidation of the material base,